Build, buy or configure operations software
Work through five gates in order: a product trial, a platform check, an edge test, an ownership check and a running-cost check. Buy or configure at the first gate that passes; build only if gates three to five all pass.

Configure means changing settings, forms and rules inside a product or platform without writing code. It sits between buying a finished product and commissioning custom code, and for operations software it is where many businesses of 15 to 200 people should land. This piece is about the order to try the three routes and the limits of the middle one; the plain build-or-buy cost comparison is a separate article.
Should you build, buy or configure operations software?
Try buying first, then configuring, and build last. The Government Digital Service says that for many projects configuring commercially available technology will work well, in a post of 3 February 2021. Build is the exception, and it needs three further checks.
The five gates, in order
1.1. Ten real jobs through the best product made for your trade: one workaround or none?
- Yes
- Buy it. Check the exit terms.
- No
- Go to gate 2.
2.2. Can a platform you already pay for, or could licence, hold your records and rules within its published limits?
- Yes
- Configure it. Use settings, not code.
- No
- Go to gate 3.
3.3. Is the process an edge, or does it cross three or more systems with retyping?
- Yes
- Go to gate 4.
- No
- Fix the process or keep the spreadsheet. A build will not help yet.
4.4. Will the supplier sign over the code, hold the source in your account, and can a named person own it?
- Yes
- Go to gate 5.
- No
- Do not build. Configure the closest platform.
5.5. Does five years of build plus running cost sit inside what the saved time and avoided errors are worth?
- Yes
- Build, and scope release one small.
- No
- Configure, or build only the one piece that fails gate 2.
Stop at the first gate that decides it. Only a build needs all of gates three to five.
What does each gate test, and what counts as a pass?
Each gate has one measurable pass mark, so the decision rests on something you counted. The marks are our rule of thumb, not measured thresholds.
- 1
Gate 1: product trial
Take ten jobs from last month, including the messy ones, and run them through a trial of the best product made for your trade. A workaround is any step done outside the product. One workaround or none is a pass.
- 2
Gate 2: platform check
A platform, here, is a configurable toolset with forms, workflow and a database. List your users, jobs per day and automated steps per job, then compare with the licence limits. Pass if everything fits without code. Keep to settings: GOV.UK warns that even small modifications to off-the-shelf software can remove most of the benefits of using it.
- 3
Gate 3: edge test
Pass if customers would notice a change in the process, or if three or more systems share one record and details are retyped at each. If neither, the cheapest fix is the process. Map the path from enquiry to invoice before you spend on software.
- 4
Gate 4: ownership
Pass if the three ownership items are agreed in writing (assignment or exclusive licence, source in your account, exit terms) and a named person owns priorities and budget after launch. Who owns the code explains each layer.
- 5
Gate 5: running cost
Pass if build plus five years of running and change costs is defensible against the saved time and avoided errors. The five-year template is in custom software or off-the-shelf.
How do you run the ten-job trial?
Gate 1 and gate 2 both depend on a fair trial, so run it like a test and not a demo. The person who normally does the work drives, and someone else counts.
- Pick the jobs before you open the product: six ordinary, two awkward, two that went wrong last month.
- Enter each from the original request, not from a tidied summary.
- Log every step done outside the product, such as a side spreadsheet, an email to a colleague or a manual calculation.
- Ask the supplier for a trial account with your own data fields. If they will only show a prepared demo, record that as a finding.
- Repeat the same ten jobs on the platform, so the two scores compare like with like.
What limits does configuring run into?
Platforms cap usage by licence, and the caps are in the documentation. Read the cap for the licence your automation will run under, against your busiest day, before you commit.
Microsoft’s Power Platform documentation, updated 10 November 2026, lists 6,000 requests per 24 hours for users licensed through Microsoft 365 apps with Power Platform access, and 40,000 for paid Power Platform users. Heavy use can be throttled. Microsoft calls these the official per-user limits. Most organisations are still in a transition period with per-flow limits instead (10,000 a day for a seeded flow, 200,000 for Premium), and the per-user rule is phased in from April 2027. Confirm which applies to your tenant.
Personal data adds a second check. Where a platform or product holds your customers’ data, the ICO’s guidance says a controller’s contract with a processor must cover things such as deletion or return of the data at the end, and prior authorisation of sub-processors (page dated 8 September 2026). This is not legal advice, so have the supplier’s terms read by a solicitor.
How do the three routes compare?
| Route | You get | You own | The ceiling | The trap |
|---|---|---|---|---|
| Buy | A finished product, working in weeks | Your data, if it exports | The supplier’s roadmap | A product you cannot leave |
| Configure | Your records and rules inside a platform | Your configuration and data | Licence caps and what settings can express | Outgrowing it, or bending it with code until it is a build |
| Build | Software shaped to your process | The code, if assigned in writing | Your capacity to maintain it | Code you do not own, and nobody to run it |
The ceiling column is where each route stops being cheap. Check it against your busiest day, not the average one.
What does a run through the gates look like?
The firm still writes down the three ownership items for its configuration: who holds the admin accounts, where the data exports to, and who changes the rules. A configured system can be orphaned too.
What should you ask, and what should a good answer sound like?
| Route | Ask | A good answer sounds like | A warning answer |
|---|---|---|---|
| Buy | Can we export every record, with history and rules, in a format we can open without you? | Yes, and they show the export on a trial account. | Export is a paid request or covers only current records. |
| Configure | Which limits and premium licences apply at our users and jobs per day? | They name the limits from their documentation and the licence tier. | "It scales" with no figure. |
| Build | Who holds the source and the hosting accounts on day one? | You do, with the supplier invited in. | The supplier holds both until final payment. |
The same three build questions appear in ten questions to ask before you sign, with the contract terms around them.
Red flags that cut across routes: a firm price before anyone has seen your ten jobs, a refusal to put ownership or exit in writing, and a supplier who cannot say what happens to your data if they stop trading. Red flags when hiring a software agency lists the checks you can do before the first call.
Questions people ask
Configuring changes settings, forms and rules inside a product or platform you licence, without writing code. Building means writing code so the software does something no product does. Configuring is faster to start and cheaper to run, but it stops at what the settings can express and at the licence limits. Building has no such ceiling and no such shortcut.
When your busiest day exceeds the licence limits, when the rule you need cannot be written in settings, or when staff would need code to maintain it and nobody can. Read the limits for your licence tier against your highest daily volume. If you are bending the platform with code to reach the result, price it as a build.
It is usually faster to start than a build, and it avoids writing and maintaining code, but licence tiers and per-user fees count. Platform limits can also push you onto a dearer tier on your busiest day. Compare real quotes for each route over five years, and price any code you add to a platform as part of a build.
A named person, with authority over the rules, the user list and the renewal. They also hold the admin accounts in the company’s name and know where the data exports to. A configured system with no owner decays in the same way as a build that nobody maintains, only more quietly.
Further reading
- GDS Technology blog: To build or to buy, that is the technology question (3 February 2021)
Configuring commercially available technology suits many projects; customisation adds cost and maintenance. Free.
- GOV.UK: Define your purchasing strategy (updated 3 September 2026)
Small modifications to off-the-shelf software can remove most of its benefits. Written for public buyers. Free.
- Microsoft Learn: Requests limits and allocations (Power Platform, updated 10 November 2026)
Per-user request limits by licence type and the throttling rule. One platform used as an example. Free.
- ICO: What needs to be included in the contract (8 September 2026)
Compulsory terms in a controller to processor contract, including return or deletion and sub-processors. Free.
- GOV.UK Service Manual: Choosing technology (updated 15 October 2024)
Work out what to build and what to buy or get for free, and minimise lock-in. Free.
AIforCompanies · https://aiforcompanies.co.uk/insights/build-buy-or-configure-operations-software
Have a problem this does not solve?
Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.