Guide
- Published 22 November 2026
- Last reviewed 22 November 2026
- 7 min read
How to work out what a manual process costs you
Multiply the hours a process takes by the loaded hourly cost of the person doing it, add what its mistakes cost, and count only the part a fix could remove. Then compare that figure with the cost of fixing it.

Most calculators multiply hours by a salary rate or add an unexplained uplift. This page builds the rate from UK employer costs, shows how to time the work without relying on memory, and ends with a range, not a single figure to defend.
How do you work out what a manual process costs you?
Use this for a repeating task that several people complain about: re-keying orders, building a weekly report from three files, chasing missing figures. It will not price strategic work or tell you which fix to buy. To choose between candidate processes first, use how to pick the first process to fix.
What is the loaded hourly rate for a UK employee?
It is the employee’s salary plus the employer costs that come with it, divided by the hours they are actually at work. Three inputs come from government sources. This is not tax or employment advice, so check your own payroll with your accountant.
- Employer National Insurance is 15 per cent above a secondary threshold of £5,000 a year for 2026 to 2027. The same page gives an Employment Allowance of £10,500, which may reduce your actual bill. We leave it out, because it changes your cash cost and not what an hour of a person’s time is worth.
- Automatic enrolment sets a minimum employer pension contribution of 3 per cent of earnings between £6,240 and £50,270 a year in most schemes. The page does not date those band limits, so check your scheme.
- Hours at work: GOV.UK says most workers on a five-day week get at least 28 days of paid leave a year, which is 5.6 weeks, and an employer may count bank holidays within it. A 37.5-hour week gives 1,950 contracted hours less 210 hours of leave, or 1,740 hours at work.
| Line | Arithmetic | Result |
|---|---|---|
| Salary | Given | £30,000.00 |
| Employer National Insurance | 15% x (£30,000 - £5,000) | £3,750.00 |
| Employer pension | 3% x (£30,000 - £6,240) = 3% x £23,760 | £712.80 |
| Total employer cost | £30,000 + £3,750 + £712.80 | £34,462.80 |
| Hours at work | 37.5 x 52 = 1,950, less 5.6 x 37.5 = 210 | 1,740 |
| Loaded rate per hour at work | £34,462.80 / 1,740 | £19.81 |
Salary alone over paid hours is £30,000 / 1,950 = £15.38, so the loaded rate is about 29 per cent higher. It still leaves out equipment, space, sickness and management time. The same method on a £60,000 salary gives about £40.
As a sense check, the ONS puts median hourly earnings (excluding overtime) for full-time employees at £20.81 in April 2026, provisional. Use your own payroll, not the median, and calculate a separate rate for each person who touches the process, because the coordinator and the manager in the example cost different amounts.
How do you measure the time without relying on memory?
Log it. Ask the person to note start and finish times on the next ten runs, and use the median, not the average and not their recollection of a typical week. NHS England’s improvement guidance puts the standard well: measure just enough to get to the next step.
- 1
Split each run into three kinds of time
Copying and reconciling, chasing missing information, and thinking or deciding. The first two are the part a fix can reach. The third usually stays with a person.
- 2
Count runs per year
Use the real count from the last twelve months, not the number the process should run.
- 3
Include the second person
Add the time a reviewer spends checking or correcting, at their own loaded rate.
- 4
Count everyone who touches it
If three people spend 20 minutes each, that is an hour, even though no one owns the process.
How do you cost the mistakes?
Count them from your own records for the last quarter, then price the time to find and fix each one, plus any direct loss. Do not use a generic error rate from a blog, because it is not your process.
- Corrections: how many figures, orders or invoices were changed after they went out? Multiply by four for a year if you counted one quarter.
- Time per correction: the minutes to find the cause, fix it and tell the people affected, at their loaded rates.
- Direct loss: credit notes, double orders, a missed renewal. Use the actual amounts from the records.
- Leave out customer goodwill and morale. They are real, but there is no honest number, so list them beside the total and do not add them.
The evidence on how often spreadsheet errors occur, and why a second reader matters, is in the hidden cost of spreadsheets.
What does the full calculation look like?
The example is illustrative: an invented weekly orders-and-stock report, built by a coordinator from three spreadsheets and reviewed by a manager. All inputs are made up to show the arithmetic, and it is not a client.
| Cost | Inputs | Arithmetic | Per year |
|---|---|---|---|
| Coordinator time | Logged median 4.5 hours, 48 runs, £19.81 an hour | 4.5 x 48 = 216 hours; 216 x £19.81 | £4,279 |
| Manager review | 0.5 hours, 48 runs, £40 an hour | 0.5 x 48 = 24 hours; 24 x £40 | £960 |
| Corrections | 5 in the last 13 weeks, so 20 a year; 1 hour coordinator, 0.5 hour manager | 20 x (£19.81 + £20) | £796 |
| Direct loss | One stock order placed twice, from the records | Actual amount | £1,200 |
| Total | £4,279 + £960 + £796 + £1,200 | £7,235 |
The 4.5 hours splits, from the log, into 2.5 of copying, 1 of chasing and 1 of reading and deciding.
Now keep only what a fix could remove, in two views.
- Narrow view, copying only: 2.5 x 48 = 120 hours x £19.81 = £2,377.
- Wide view, adding the chasing, the corrections and the direct loss: 3.5 x 48 = 168 hours x £19.81 = £3,328, plus £796 and £1,200, giving £5,324.
- Both views leave out the manager’s review, on the assumption that a check stays after any fix.
- The honest answer is a range of £2,377 to £5,324 a year, not £7,235.
Write the assumptions beside the range. The wide view assumes a fix removes every correction and would have prevented the double order, which nobody can promise. If you cannot log ten runs, time three, and say so next to the figure, so the reader knows how firm it is.
What do you compare the range with?
Compare it with the total cost of the fix over three years, including running costs, not the build price alone. Three years is our rule of thumb, not a standard. Multiply the range: 3 x £2,377 = £7,131 and 3 x £5,324 = £15,972 in the example.
- A quote well above the top of that three-year range needs a reason beyond this one process, such as several processes sharing the fix.
- A quote well below the bottom is worth a conversation, but ask what it leaves out, such as hosting, support, changes after launch and the time your own people will spend testing it.
- If the range is small, the cheapest fix is an agreed way of working or a spreadsheet change. Mapping the process from enquiry to invoice helps you find which.
Time freed is not cash saved. It becomes cash only if hours are reduced or the person does work that earns or saves money. Say which before the number goes to a partner or a board.
What mistakes make the number wrong?
- Using salary over paid hours. It understates the cost of an hour at work.
- Counting the same hour twice. Time spent correcting a mistake belongs under mistakes, not also under the task.
- Assuming every hour disappears. Thinking and deciding stay with a person.
- Using percentages from vendor pages. Some published calculators add a percentage uplift for risk or error with no stated basis. Use your own log and records.
- Stopping at one process. If the same re-keying runs in four places, the cost sits across them, which is why spreadsheets that need replacing often show up in groups.
Questions people ask
It depends on your hours, rate and error count, so a generic figure would mislead. Work it out as runs per year x hours per run x loaded hourly rate, then add the cost of corrections. The loaded rate includes employer National Insurance and pension, and is higher than salary divided by paid hours.
Add salary, employer National Insurance (15 per cent above £5,000 a year in 2026 to 2027) and the employer pension contribution, then divide by the hours actually at work after leave. The table above shows £19.81 for a £30,000 salary. Your payroll or accountant has the exact figures. This is not tax advice.
List it beside the total and do not add it. Delayed replies, slower invoices and staff frustration are real, but there is no honest way to price them from a log. Adding a guessed percentage weakens the whole calculation. Present the measured range, then name the unpriced effects in words.
No. Only the part a fix can remove counts, and time freed becomes cash only if hours fall or the person does work that earns or saves money. In the example, a measured annual cost of £7,235 became a range of £2,377 to £5,324 once only the part a fix could remove was kept.
Further reading
- GOV.UK: Rates and thresholds for employers 2026 to 2027
Employer National Insurance of 15 per cent, secondary threshold of £5,000 a year and Employment Allowance of £10,500. Opened 22 November 2026. Free.
- GOV.UK: Workplace pensions, what you, your employer and the government pay
Minimum employer contribution of 3 per cent and earnings band of £6,240 to £50,270, undated. Opened 22 November 2026. Free.
- GOV.UK: Holiday entitlement
At least 28 days, or 5.6 weeks, of paid leave for most workers on a five-day week, and bank holidays may be included. Opened 22 November 2026. Free.
- ONS: Employee earnings in the UK, 2026 (released 22 October 2026)
Median hourly earnings excluding overtime for full-time employees, £20.81 in April 2026, provisional. Opened 22 November 2026. Free.
- NHS England and NHS Improvement: Measurement for improvement, an overview (QSIR tools)
Measure just enough to get to the next step. Undated copy hosted by Dorset County Hospital. Opened 22 November 2026. Free.
AIforCompanies · https://aiforcompanies.co.uk/insights/what-a-manual-process-costs-you
Have a problem this does not solve?
Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.