Guide

Published 22 November 2026
Last reviewed 22 November 2026
7 min read

What a software project should cost to scope

Price scoping as a fixed fee for a stated number of days, quoted before work starts, with the written output handed over to keep. Published ranges disagree, so build the figure yourself from days and a day rate.

A blue pen lies across a blank lined page of a spiral-bound notebook on a pale wooden surface.
A scope you can write down is a scope you can price.

Three suppliers can quote the same job at very different prices because each is pricing a different amount of unknown. Scoping is the paid step that removes the unknown, so its price should be small beside the build and easy to check.

What should it cost to scope a software project?

We found no independent UK benchmark for the price of scoping a custom business system. What exists is a method: days of work, multiplied by a day rate, plus VAT, agreed as a fixed fee before anyone starts. The ranges that suppliers publish differ from each other, as the next section shows.

This is for a business of 15 to 200 people that expects to buy a custom system, such as an order tracker or a client portal, where the build will run for months. It is not about a plug-in, or a product you buy and configure.

What do published figures say about the cost of scoping?

Government and supplier sources give different kinds of answer. None is a UK price list for a business like yours.

Published figures on scoping, as we read them on 22 November 2026
SourceWhat it saysBasisHow far to rely on it
GOV.UK Service Manual, discovery phaseAround 4 to 8 weeks is typical, and the purpose should set the length.Guidance for government digital services, last updated 21 June 2021.Good on duration. Gives no fee.
Kolonell, 8 October 2026Typically 5 to 12% of the development budget, over 3 to 6 weeks. Its example is 4,000 to 12,000 euros on an 80,000 euro project, which does not match its own percentages (12% of 80,000 is 9,600).A supplier’s blog. Cites no source.One supplier’s view, in euros.
Leanware, 1 September 2026A fixed fee of 5,000 to 15,000 dollars over 2 to 4 weeks.Its own offer. It says the range is not a claim about the average market price.One supplier’s offer, in dollars.
GOV.UK cost estimating guidance3% to 5% of a project’s total cost is expected before construction starts.Written for major infrastructure projects, not software.Shows the idea of spending early. Not a software norm.

Durations overlap at roughly two to eight weeks. The only software figure for share of budget is one supplier’s, with no data behind it. Treat it as that supplier’s view, not a benchmark, and do not quote it back to a supplier as a rule.

The GOV.UK discovery guidance says there is no set period and that around 4 to 8 weeks is typical. Kolonell and Leanware both sell this work, so read their ranges as price lists, not surveys. The 3% to 5% rule is aimed at infrastructure, and the guidance says it was not written for non-construction projects.

How do you build the number yourself?

Ask who will work on it and for how many days each, then multiply. A scoping team can be as small as three people: one who runs the sessions and writes, one who tests the technical risk, and one who sketches the main screens.

Worked example (illustrative, not a market rate and not our price): a scoping fee built from days
RoleDaysIllustrative day rateLine total
Lead analyst: runs the sessions, writes the scope6£600£3,600
Technical lead: tests the risky parts3£750£2,250
Designer: sketches the main screens2£500£1,000
Total before VAT11£6,850

Arithmetic: 6 x 600 = 3,600. 3 x 750 = 2,250. 2 x 500 = 1,000. Sum 6,850. VAT at 20% adds 1,370, so 8,220 to pay. If the build is later priced at 80,000 (also illustrative), the scoping fee is 8.6% of it before VAT (6,850 / 80,000).

Quotes should say whether VAT is included, because the standard rate is 20% and it moves a total by a fifth. Then test the elapsed time. Kolonell, a supplier, says that beyond six weeks the scope is “probably too broad”. That is one supplier’s rule of thumb, with no data cited, but it is a useful prompt to ask why a quote runs longer.

What makes the days go up or down?

Five things move the number more than anything else. Ask a supplier which of them they have assumed.

  • User groups. Each group that sees different screens or rules adds sessions.
  • Connected systems. Every link to accounting, email or a customer system needs someone to read its documentation and test it.
  • Rules and exceptions. The special cases that live in one person’s head take longest to extract.
  • Data to move. Old spreadsheets with free text and duplicates need an assessment before anyone can promise a migration.
  • Personal data. The ICO says data protection by design starts at the initial planning stages of a system, so scoping should cover what is held, why and for how long. This is not legal advice.

A job with one user group, one connection and clean data can be scoped in fewer days than the example above. A job with several sites, regulated data and an old database needs more.

What should the fee buy, and how should it be billed?

It should buy written outputs you own and could give to another supplier, billed as a fixed fee or as time and materials with a cap. What those outputs are is set out in what to have before any code is written.

The UK government’s guidance on contracting for agile says time and materials is most suitable for the discovery stage of a hybrid contract, so the supplier can scope the requirement. The choice of pricing model for the build itself is a separate decision, covered in fixed price or time and materials.

How do you check a scoping quote?

Check seven things on the page before you sign. If a line is missing, ask for it in writing.

  • Days by role and the rate, not a single total.
  • A fixed total and an end date, and what happens if the work runs over. A cap protects you. An open-ended extension does not.
  • Named outputs, in formats you can open without the supplier’s software.
  • Ownership of the outputs, stated. Who owns what is set by contract, as the piece on what to do when a developer leaves explains for code.
  • A decision point at the end, with no obligation to buy the build.
  • Who attends: the people who do the work, not only the owner.
  • VAT stated, and whether expenses are extra.

When is paid scoping not worth it?

Skip it when the job is small enough to price from a good brief, or when a product you can buy already does the job.

  • A change to an existing system, made by the people who built it and still hold the documentation.
  • A small tool with one user group and no links to other systems. Write a brief a developer can price and ask two or three suppliers to quote from it.
  • A need that an off-the-shelf product covers with settings alone. Scoping the purchase is cheaper than scoping a build.

Scoping can also end with a decision not to build. The GOV.UK guidance says it is not a failure to stop at the end of discovery if your research shows that is best, for instance where the cost outweighs the expected improvement. A supplier whose income is the build has a reason to find a build, so ask what would make them advise against one. The common way a build stalls is explained in why internal software projects stall.

What mistakes do buyers make when paying for scoping?

  • Comparing quotes by total only, when one includes two designers and another includes none.
  • Asking for a build price first and scoping afterwards. The supplier then prices the gaps, and the GOV.UK cost guidance says an early estimate should be a range that narrows as the scope matures.
  • Letting scoping slide into build with no decision, so the first sprint starts on a scope nobody signed.
  • Paying for scoping without a brief. The first days then go on questions you could have answered in an hour.

Questions people ask

The GOV.UK discovery guidance says around 4 to 8 weeks is typical for government services and that the purpose should set the length. The two suppliers we read publish 2 to 6 weeks between them, as their own offers. For a business system, ask why if a quote runs past about six weeks, and whether the job should be split into smaller lots.

A free quote suits a small, well-written job. For a larger system the supplier has to price things you have not yet decided, and the government cost guidance says early estimates are ranges that narrow as scope matures. Paying for scoping turns that uncertainty into a visible fee and gives you documents you can take to other suppliers.

There is no standard. Some suppliers credit it, some do not, and either can be fair if it is stated. Ask before you sign and have the answer written into the scoping agreement, together with the point that you are free to take the outputs to another supplier if you stop.

That is a legitimate result. The GOV.UK guidance says it is not a failure to stop at the end of discovery if the research shows that is the best thing to do. You keep the written findings and have spent far less than the build would have cost.

Further reading

Have a problem this does not solve?

Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.

Book a call

Start here

Tell us what takes your team time.

Leave a few lines and we will reply by email.

Or email [email protected]

Company size

Used to reply to you. See our privacy notice.