Key term
- Published 22 November 2026
- Last reviewed 22 November 2026
- 3 min read
What is a minimum viable product?
A minimum viable product (MVP) is the smallest usable version of a product that lets a team learn from real users what to build next. It tests an idea through real use, not a cheap copy.

The Agile Alliance glossary defines it as the version that collects the maximum validated learning about customers, and warns that teams stress the minimum part to the exclusion of the viable part.
What does a minimum viable product include?
The one job users most need, built to a standard they can rely on, and little else. The Lean Startup site describes developing an MVP to begin the process of learning as quickly as possible. GOV.UK’s service manual gives the loop: build something that meets the most important need, show it to users, listen, improve, then repeat for the next need.
| Stage | Used by | Built to | Question it answers |
|---|---|---|---|
| Prototype | A few testers, not relied on | Throwaway standard | Is this the right idea? |
| MVP | Real users, for real work | Production standard, narrow scope | Does it do the job, and what next? |
| Full product | Everyone it was meant for | Production standard, wider scope | Does it run the process end to end? |
GOV.UK describes alpha prototypes as not production quality code that the public should not use. That is the prototype row, not the MVP row.
Why does the term decide a purchase?
Because in a quote it can mean a throwaway demo or a usable first release, and the price differs accordingly. Agree four things in writing: who uses it, which job it does, what counts as success, and what happens after release.
We think the single most useful step is to ask the supplier to write the four answers into the quote.
How do you decide what goes in the first release?
Sort every wanted feature with MoSCoW. GOV.UK describes must-haves as essential things that your product cannot function without. Your MVP is your must-have list, built well.
| Group | GOV.UK description | Illustrative example |
|---|---|---|
| Must have | Cannot function without | Create a quote, send for approval, record the decision |
| Should have | Greatly improves it, not crucial | Reminder emails to approvers |
| Could have | Little harm if left out for now | A summary dashboard |
| Will not have | Agreed not to do | Customer portal, in release one |
Scoping release one is covered in why internal software projects stall, and the groundwork in the discovery phase.
When is a minimum viable product the wrong approach?
When a rule requires the whole before anyone can use it. HMRC’s notice on Making Tax Digital for VAT says transferring data between software programs must be digital where it forms part of your electronic account, and does not treat copy and paste as a digital link. A first release in that chain has to meet the rule. Check the current notice; this is not tax advice.
We think a tool that follows a method others have solved, such as a standard time sheet, is better bought than started small. Where the build can be assembled in a visual tool, see what is low-code.
Questions people ask
It is the smallest version of a product that real people can use for a real job, released so that the team learns what to build next. It is narrow but dependable. The aim is learning from use, which is why a half-working demo does not count.
No. A prototype tests an idea, usually with a few testers, and is often thrown away. An MVP is used for real work and is built to a standard people can rely on. GOV.UK’s alpha phase is a prototype stage: not production quality and not for public use.
List every feature you want, then sort them into must have, should have, could have and will not have. The must-haves are the first release. Include anything a rule requires, such as digital records for tax. Agree the list with the supplier in writing before work starts.
It can, by spending on the most important job first and learning before spending more. It does not make the full product cheaper. A narrow release still needs to be built properly, and the later releases still need paying for. Ask for a price for release one and an estimate for the rest.
Further reading
- Agile Alliance: MVP glossary entry
Definition, and the warning about stressing minimum over viable. Free.
- The Lean Startup: Principles
Developing an MVP to start learning, and the build-measure-learn loop. Free.
- GOV.UK Service Manual: Core principles of agile
Iterate: build, show users, improve, repeat. Free.
- GOV.UK Service Manual: Alpha phase
Prototypes, not production quality, not for public use, 6 to 8 weeks. Free.
- GOV.UK Service Manual: Deciding on priorities
The MoSCoW method and its four groups. Free.
- HMRC: VAT Notice 700/22 Making Tax Digital for VAT
Digital records and digital links, updated 1 April 2022. Free.
AIforCompanies · https://aiforcompanies.co.uk/insights/what-is-a-minimum-viable-product
Have a problem this does not solve?
Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.