Guide

Published 22 November 2026
Last reviewed 22 November 2026
7 min read
Part 5 of 5

Developer handover day

Run handover day as a timed demonstration, not a talk: the developer shows, a second person does it, and you sign off only what was proved. A full day fits six blocks, from logins to a restore.

A long glass-fronted corridor with a blue sofa, a standing lamp and a yellow chair in the room at the left.
A good handover day ends with the new owner able to run everything alone.

A handover that ends with a conversation and a zip file proves nothing about whether anyone can run the software. This is part 5 of 5 in a series, and it turns the documents from part 2 into a day you can check.

What should happen on handover day?

The person who knows the system operates it, and the person who will own it repeats each step with the author watching and silent. You observe, record and decide what counts as done.

You need the tier-one documents before the day, so ask for them early. If you do not yet have an inventory of what exists, do the first four weeks first.

The Institute for Research Software’s guide, Help, my developer is running away, says to start as early as possible because handover is time-consuming and complex, and to agree a prioritised list of what must be covered. It also advises regular, frequent knowledge sessions because the leaving developer has little time. A day is the proof of those sessions, not a replacement for them.

Who needs to be in the room?

  • You, or whoever can say yes. You decide what counts as proved, and you accept or reject at the end.
  • The developer. They demonstrate first, then watch and answer only when asked.
  • The receiver. The person or firm who will keep the software running: an employee, a new supplier or an independent reviewer. They hold the keyboard for every repeat. If you have not chosen one, an independent reviewer who is not bidding for the work is the safest receiver.
  • A daily user. They show the three jobs they do most and the workarounds they use, which no document will hold.

Axon Build’s guide to a technical handover session describes a recorded one-hour version, published 4 October 2026 for a founder whose developer is leaving, built on the same principle that the person who knows the system operates it in front of the person who will own it. Use that if your system is small and simple. The sheet below is for one that runs several jobs and several accounts.

What do you prepare before the day?

Three things: the documents, a rehearsal and a safe place to try things. The day goes wrong when any of them is missing.

  1. 1

    Two weeks before: ask, book and fix the date

    Request the tier-one documents in writing, name the receiver, and put the day in everyone’s diary. Send the run sheet to all four attendees. Simple Thread’s handover checklist likewise advises planning a transition period with access to the previous engineers.

  2. 2

    One week before: rehearse blocks 1 to 3

    The receiver follows the written steps for logins, release and restore. Every stall is a gap in a document, and the developer fixes it that week.

  3. 3

    The day before: set up somewhere safe

    Confirm a scratch copy exists for the restore, pick a harmless change with no effect on customers, and check the recording works.

What does the run sheet look like?

Six blocks, about seven hours with a break, ordered so the work that decides whether you can recover comes first.

The run sheet: our own timing, to adjust to your system

  1. 09:30

    1. Logins and ownership

    Developer walks through the access register account by account. Receiver signs in to each account with company details only. Proof: every account has a company owner and a successful sign-in.

  2. 10:30

    2. Release and undo

    Developer puts a harmless change live, then undoes it. Receiver repeats both from the written steps while the developer stays silent. Proof: the receiver’s change went live and came back.

  3. 12:00

    Break

  4. 12:45

    3. Restore

    Developer restores the latest backup into a scratch copy. Receiver repeats it, then opens a recent customer record. Proof: the record opened, and the time taken is written down.

  5. 14:00

    4. Jobs and services

    Developer lists each scheduled job and outside service, and runs safe jobs by hand. Receiver checks each against the schedule list and the card statements. Proof: every job has an owner, every service a renewal date.

  6. 14:45

    5. A day in the life

    Developer names known faults and fragile parts. Receiver watches a daily user do the three main jobs. Proof: notes on quirks that the new owner did not know.

  7. 15:45

    6. Questions and follow-ups

    Developer answers open questions. Receiver raises what is still unclear. Proof: a follow-up register with a name and a date on each line.

Every block ends with a proof you record, and the 16:30 sign-off follows the sheet below. Add time to blocks 2 and 3 if the system has several environments.

Record the whole day on video and keep it with the documents. Software consultancy SSW’s handover rule advises recording the meeting for later reference, ending with a short summary, and confirming completion by reply to the checklist email.

What should the sign-off sheet say?

One line per proof, initialled by the receiver, with open items given a name and a date. Anything not proved stays open.

Sign-off sheet, to copy: tier-one lines first
LineProved byStatus
A. Every account is owned by the company and the receiver signed inBlock 1, recordedProved, open or failed
B. Release and undo repeated by the receiver from written stepsBlock 2, recordedProved, open or failed
C. Backup restored and a real record openedBlock 3, recordedProved, open or failed
D. Scheduled jobs and outside services listed with owners and datesBlock 4Proved, open or failed
E. Known faults written downBlock 5Proved, open or failed
F. User workarounds recordedBlock 5Proved, open or failed
G. Recording and documents stored in a company-owned placeCheck by ownerProved, open or failed
H. Follow-up register agreed with names and datesBlock 6Proved, open or failed

Our own rule: accept only when lines A to D are proved. E to H may stay open if each has a named owner and a date.

When should the leaver’s access end, and what about pay?

End the leaver’s access last, after the day has been accepted and the company-owned accounts are working. Do not link an employee’s final pay to the handover.

On pay, GOV.UK’s page on deductions from pay says you are normally entitled to be paid everything you have earned up to the point you finish, and that an employer may not make deductions unless the law allows it, you agree in writing or your contract says they can. Holding back wages to force a handover is therefore risky. For a contractor or agency, payment tied to acceptance has to be in the contract before the day.

Which mistakes spoil the day?

  • Holding it on the developer’s last day. A rehearsal a week earlier leaves time to fix what fails.
  • Letting the developer drive throughout. If the receiver never touches the keyboard, nothing has been proved.
  • Skipping the recording. Memory fails by the following month, and a recording is a company asset.
  • Sending the owner’s decision to someone who cannot say yes. Someone with authority attends or signs.
  • Treating acceptance as the end. Ownership questions stay open until the paper is signed, as who owns the code in a custom build explains.

If the day shows the software cannot be run by anyone else, the next question is whether to keep it or replace it, covered in rescue or rebuild.

Questions people ask

It depends on the system, so we cannot give a reliable figure. A small system may fit the essentials into one recorded hour, and a system with several jobs and accounts is better served by a full day, with a rehearsal a week earlier. Agree the schedule early, because the leaving developer has little time.

The person who can accept the work, the developer, a receiver who will run the system afterwards, and a daily user. The receiver matters most, because they repeat each step on their own while the developer watches. Without a receiver, the day becomes a talk and nothing is proved.

Be careful. For an employee, GOV.UK says you are normally entitled to be paid everything earned up to the point they finish, and deductions need a legal basis, written agreement or a contract term. For a contractor, payment tied to acceptance must be in the contract. This is not legal advice, so ask a solicitor first.

Record what you asked for, and when, in writing. Then work from what you already hold: the copy, the inventory and any documents. An independent reviewer can reconstruct tier-one items from the code and the accounts. Whether you can compel help depends on the contract, so take advice before escalating.

Further reading

Have a problem this does not solve?

Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.

Book a call

Start here

Tell us what takes your team time.

Leave a few lines and we will reply by email.

Or email [email protected]

Company size

Used to reply to you. See our privacy notice.