Buyer guide

Published 22 November 2026
Last reviewed 22 November 2026
7 min read
Part 4 of 5

Rescue or rebuild inherited software

Keep and repair inherited software unless a written assessment names a failure that repair cannot fix. When something must be replaced, replace it in stages, with the old system running alongside until the new one has proved itself.

A close view of a power drill driving a screw into a weathered plank of timber.
Fixing what exists is often cheaper than starting again, until it is not.

Week three of the first four weeks gives you six tests on your own copy. This is part 4 of 5, and it covers what comes after: judging the recommendations and quotes you will now be sent, most of which will say rebuild.

Rescue or rebuild inherited software: which should you choose?

Rescue by default. Rebuild only when the written case meets five conditions, set out below, and even then in stages. Replacing with a product you buy is a third route, and where a product does the core job it can be the cheapest of the three.

Who gains from the advice you are getting?

Whoever sells the rebuild. That does not make the advice wrong, but it means the advice needs evidence that you can show to a second person.

Several of the pages that rank for this question are published by firms that sell both software reviews and software development. Redwerk and Test Double each promote their own audits or assessments alongside the advice. Their criteria are sensible and we use some of them below. The point is that you should know who is advising you.

What does the evidence say about rewrites and about staying put?

It is thinner than the confident advice around it suggests. Most of it is experience, not measurement, and the two sides disagree about how to weigh it.

  • Against a single big rewrite. Joel Spolsky argued in an April 2000 essay that rewriting from scratch is the worst strategic mistake a software company can make, citing Netscape, which he said was almost three years past its last major release, version 4.0, while it rewrote its browser. It is one practitioner’s opinion, not a study.
  • For going gradually. Martin Fowler wrote on 22 August 2024 that a simple replacement plan has gone wrong most of the time he has seen it, because full replacements take long and existing behaviour is hard to specify. He advises replacing one small piece at a time.
  • Government guidance agrees. GOV.UK’s service manual advises moving away from legacy systems in stages, by wrapping the old system so parts can be replaced independently, and says not to recreate the same system with new technology.
  • Against staying put. Staying is not free. The National Audit Office’s December 2022 report on Defra quotes a Cabinet Office finding from July 2021 that nearly half of all technology expenditure across government in 2019 went on keeping outdated legacy systems running. That is government-wide spending, not a small business, but the pattern of maintenance crowding out new work will be familiar.

The balanced reading is that neither extreme has strong evidence, and that staged replacement is the choice both sides can defend.

What must be true before you agree to a rebuild?

Five conditions, each with evidence you can ask to see. Count how many are met.

The rebuild case: five conditions and the evidence for each
ConditionEvidence to ask forCounts as met when
1. A named failure repair cannot fixThe specific fault: a part past its maker’s support date, a build that fails, data locked in an unreadable form, a flaw in the foundation.A second person has seen the evidence and agrees repair would cost more than it saves.
2. A written list of what it does todayA parity list from the running system: each function marked keep, change or drop, in plain words.You or your staff have signed it off, including the quirks people rely on.
3. A business reason beyond tidinessWhat the new version allows that the old cannot: a changed process, a new service, a volume it cannot handle.You can state it without using the word "modern".
4. A plan to move the data and run bothA trial migration on a copy, record counts compared before and after, a period with both systems live, a way back.The plan names dates and who checks the numbers.
5. Terms you can live withA fixed-scope first stage, ownership of the new code agreed, handover documents named as deliverables.You hold a draft that a solicitor has read.

Our own thresholds, not a standard: five met means a rebuild plan can go ahead, three or four means stage it or rescue first, under three means rescue.

Condition 4 matters more than it looks. The government’s guidance on mitigating and preventing legacy IT says to plan for dual running if a system is being replaced, and to know what you have and what switching it off would affect.

What should a supplier answer in writing?

Seven questions, each with what a good answer sounds like. Ask them of any supplier, including us, before you sign.

  • Which of our needs can the current code not meet, and how do you know? A good answer names the need and shows the evidence: a support end date from the maker, a failed build, a measured limit. A poor one says the code is messy.
  • What does the new system do on day one that the old one does? A good answer produces a parity list from the running system and asks you to mark each line keep, change or drop.
  • How will our data move, and how will we check it? A good answer describes a trial run on a copy, with counts compared before and after, and a reconciliation you can read.
  • Could we replace it in stages? A good answer names the first slice, what stays on the old system meanwhile, and how the two are connected. Wanting only one big cut-over date is a warning.
  • Who owns what we pay for, and could another supplier take it over? A good answer is a signed assignment or exclusive licence, the documents in documentation to ask for, and accounts in your name. Ownership in general is covered in who owns the code in a custom build.
  • What is fixed and what is estimated? A good answer fixes the scope and price of stage one and says plainly what is an estimate. Fixed price or time and materials covers the trade-offs.
  • How will we know it is finished? A good answer lists the acceptance checks before work starts, including a restore test and the parity list passing.

Which signs should make you stop?

  • A rebuild is recommended before anyone has seen the system running.
  • The price is a round number with no parity list behind it.
  • The assessment cannot be shared with another supplier.
  • The new design is said to need no documentation because the code will be clean.
  • You are asked for the leaver’s accounts, not a new set in the supplier’s own name.
  • The cut-over is one date, with the old system switched off the same day.
  • Nobody will say what is deliberately not being carried over.

Any one of these is a prompt to ask a question. Two or more is a reason to get a second opinion. Red flags when hiring a software agency in the UK covers the supplier checks that sit behind this list.

What should the agreement contain?

Ask for these in writing, and have a solicitor read the contract before you sign.

  • A written statement of who owns the new code, and a licence to the supplier’s reusable parts that survives the end of the contract.
  • Stages with their own price and acceptance checks, so you can stop after any one.
  • The parity list, the migration plan and the documents as named deliverables.
  • A period of dual running and a written way back to the old system.
  • Your data in a standard format on request, and deletion when the contract ends.

Questions people ask

We cannot give a reliable general answer, and the pages that do tend to be written by firms that sell one of the two. Repair is usually the smaller change and the easier to stop. A rewrite is justified where a named failure cannot be repaired, and is safer in stages than in one go.

It is a plain-words list of everything the current system does, written from watching it run and talking to the people who use it, with each line marked keep, change or drop. It stops a rebuild quietly losing a function that staff rely on, and it gives you something to accept the new system against.

It means replacing the old system one piece at a time while it keeps running, rather than switching everything on one date. GOV.UK’s service manual describes wrapping the old system so that parts can be swapped independently. Each stage is smaller, can be checked, and can be stopped without losing what already works.

It is not wrong, but it is safer to buy the assessment separately, for a fixed scope, with a written output that any supplier can read. That way the recommendation does not depend on who wins the work. If one firm does both, ask to see the evidence behind any recommendation to rebuild.

Further reading

Have a problem this does not solve?

Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.

Book a call

Start here

Tell us what takes your team time.

Leave a few lines and we will reply by email.

Or email [email protected]

Company size

Used to reply to you. See our privacy notice.