Guide
- Published 22 November 2026
- Last reviewed 22 November 2026
- 8 min read
Process mapping for non-specialists in 60 minutes
To map a business process without being a specialist, sit with the person who does the work for one hour, write what happens as numbered steps, trace one real case through the list and keep a separate list of exceptions.

You need a pen, paper and a recent job with its paperwork. The result is a one-page list you can check, price and hand to a developer, and drawing it as a diagram is optional.
What is the 60-minute method, and what does it produce?
It produces three things on one page: the main path in numbered steps, a list of exceptions, and a list of open questions where the answer was "it depends" or "I am not sure". The third list is the most useful. It shows where the process is held in someone's head.
Who and what do you need in the room?
Three people and one real case. Anything more is a workshop, and the point here is that you can do it on a Tuesday afternoon without booking one.
- The mapper. That is you, writing and asking questions, not answering them.
- The doer. The person who carries out the process, not the person who manages it. Managers describe the procedure. Doers describe the work.
- The reader. Someone who receives the output of the process or hands work into it. They say "that is not what I see" and are worth more than a second doer.
- One recent case. A real job, order or request from the last month, with whatever paperwork it left: emails, forms, spreadsheet rows, screenshots.
Interviews alone can produce inaccurate assumptions and miss variation, so Gloucestershire Hospitals' process mapping guidance says to validate the pathway with several stakeholders and use observation to test it.
What does the hour look like, minute by minute?
| Minutes | What you do | What you have at the end |
|---|---|---|
| 0 to 5 | Name the process by its trigger and its result, in one line each. "A supplier asks to be paid" to "the supplier is set up and can be paid". | A start and an end, written at the top of the page |
| 5 to 30 | Walk the recent case with the doer, one step at a time, asking "what happens next?" Write each step as a numbered line starting with a verb. | A numbered list, usually 8 to 15 lines |
| 30 to 40 | Go back through the list asking, for each line, where the information comes from and where it goes. Mark any line where it is typed again. | Systems and re-typing marked on the list |
| 40 to 50 | Ask "when does this not go to plan?" Write each answer on a separate exceptions list, with how often it happens. | An exceptions list, kept apart from the main path |
| 50 to 60 | The reader reads the list aloud and marks every line they disagree with or do not understand. | Disagreements, and a list of open questions |
If the process has several roles, run the hour once per role and put the lists side by side. The disagreements between them are the finding.
Resist fixing anything in the hour. The moment you say "we could change that", the doer starts describing the process as it should be. NHS Lothian's guidance says maps should show how things happen in reality, not how they would ideally happen. Strathclyde's is blunter: map what happens, not what you would like to think happens.
How do you write a step so that it can be checked?
One actor, one verb, one thing handed on. A step you can check is a step you can disagree with.
- 1
Start with a verb and name the role
"Finance checks the company number at Companies House", not "Company number" and not "Checking stage".
- 2
Put decisions as yes or no questions
Gloucestershire's guidance says decision boxes should be phrased as a question, with at least two ways out. "Is the bank detail form signed? Yes: go to 6. No: go to 4."
- 3
Write what is handed on
Each step ends with something that moves: a form, a status, an email, a payment. A step with nothing handed on is usually two steps or a habit.
- 4
Keep exceptions off the main path
If something happens once in ten cases, it goes on the exceptions list with its frequency. If it happens in five of ten, it is part of the path.
- 5
Use roles, not names
A holiday should not change the map.
You do not need a drawing standard. BPMN, published by the Object Management Group, is a flowchart notation for business processes, and it is useful if a supplier asks for it. For a first map, rectangles for steps, diamonds for questions and arrows are enough. AHRQ's guidance says to use a consistent symbol for each type of component and to draw the final map as observed.
What does a finished one-page map look like?
Illustrative map: setting up a new supplier so that it can be paid
- 1
1 Receive the request to add a supplier
Budget holder to finance. Email with name and what is being bought.
- 2
2 Send the supplier a details form
Finance. Form out by email.
- 3
3 Receive the completed form
Finance. PDF back in the shared inbox.
- 4
4 Check the company number and address
Finance. Public register lookup against the form.
Re-typed into the notes column
- 5
5 Is the bank detail form signed?
Finance. Yes: go to 6. No: return to 2.
- 6
6 Create the supplier in the accounts package
Finance. Form to accounts package.
Re-typed, all fields keyed
- 7
7 Approve the new supplier
Finance director. Screenshot emailed for sign-off.
- 8
8 Tell the budget holder they can raise an order
Finance. Reply to the step 1 email.
Two of the eight steps re-type information, and those are the two to time first.
Illustrative figures for the example, not measured.
- Exceptions: urgent supplier needed same day (about 1 in 10, steps 4 and 7 skipped by phone); supplier is a sole trader with no company number (about 1 in 5).
- Open questions: who decides when a skipped check is acceptable, and where is the record of that decision kept.
Eight steps, two re-typed handoffs, two exceptions and two open questions, on one page. The open questions are the output that matters. Nobody could say where a skipped check is recorded, which is a control gap and not a software problem, and one hour found it.
How do you tell whether the map is true?
Score it against six checks within a day of the session. The checks, the pass mark and the 60-minute split are our own method, tested against the sources below rather than taken from them. Five or six passes and it is ready to use. Fewer, and the gaps below tell you what to redo.
| Check | How to do it | Pass if |
|---|---|---|
| 1 Second case | Trace a different real case through the list, using its paperwork | Every step happened in that order, or the difference is on the exceptions list |
| 2 Cold read | Hand it to someone who has not seen the process | They can say what happens without asking you |
| 3 Second doer | Show it to another person who does the same job | They agree, or their differences are written down |
| 4 Handoffs | Look at every step that passes work to another role | Each says what is passed and how |
| 5 Exceptions | Count the list | Each has a frequency, and none happens in half the cases |
| 6 Owner | Check the top of the page | One person owns the process and the map |
Failing check 3 is a finding, not a fault in the map. NHS Lothian advises discussing the parts people do differently and reducing that variation before other changes.
What do you do with the map once you have it?
- Cost it. Time the re-typed steps for a fortnight and put a figure on them using how to work out what a manual process costs you.
- Fix the agreements first. Open questions and differences between doers usually need a decision, not a build.
- Brief a supplier from it. A numbered path with exceptions and frequencies is most of what a brief a developer can price needs.
What mistakes make a non-specialist map unreliable?
- Interviewing the manager. They know the procedure. The doer knows the work.
- Mapping the procedure document instead of a real case.
- Drawing before listing. A diagram hides gaps that a numbered list exposes.
- Letting the exceptions swallow the path. A path with forty branches is several processes.
- Filing the map without an owner. Without one it is out of date within a quarter.
Questions people ask
Yes. A pen and paper, or a shared document, is enough for a first map. Write numbered steps, one per line, then list exceptions separately. Diagram tools help you share a tidy copy later, but the value comes from the conversation with the person who does the work and from testing the list against a real case.
About an hour to draft one process from one person's point of view, plus a short follow-up to test it against a second real case and a second doer. A process with several roles takes one hour per role. Allow another half hour to put the lists side by side and note where they disagree.
The person who does the work, not the person who manages it, and one person who receives the output. Use a real case from the last month with its paperwork. Managers tend to describe the written procedure, while the person doing the work describes what actually happens, including the workarounds.
No. BPMN is a standard flowchart notation published by the Object Management Group, and it is useful if a supplier asks for it. For a first map, a numbered list with decisions written as yes or no questions is enough, and most colleagues can read it without a legend.
Further reading
- Gloucestershire Hospitals NHS Foundation Trust: Process mapping guidance
Interview and walkthrough methods, symbols, decision boxes phrased as questions, validating with several stakeholders. Free.
- NHS Lothian Quality Improvement: Process mapping (new guidance)
Map how things happen in reality, not ideally; discuss the parts people do differently and reduce that variation first. Free.
- University of Strathclyde: A simple way to map a process
Eight step method on sticky notes. Map what happens, not what you would like to think happens. Free.
- AHRQ: Process mapping, how to do it
US Agency for Healthcare Research and Quality. Observe the current process, one card per step, draw it as observed. Free.
- Object Management Group: Business Process Model and Notation 2.0.2
The standard flowchart notation for business processes, version 2.0.2, January 2014. Free.
AIforCompanies · https://aiforcompanies.co.uk/insights/process-mapping-for-non-specialists
Have a problem this does not solve?
Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.