A weekly multi-site pack: what goes on one page

A weekly multi-site pack is one page: a row per site, the same columns every week, a fixed cut-off and three lines of words. Compare like trading days, and flag only what moves outside each site's range.

Two tower cranes stand against a pale sky beside a tall building wrapped in scaffolding.
A weekly pack from every site is useful when it has the same shape each week.

Most weekly packs fail on the calendar before they fail on the numbers. A bank holiday lands in different weeks in different years, and in different weeks in Scotland and England, so last year's week is not a fair comparison until you adjust for it. This is part 4 of 4 on running several sites. It turns the owner view from part 3 into a routine, using the definitions from part 1.

What goes on the one page?

One row per site, six or seven columns that never change, a flag, a named owner for each flagged row, and three sentences from whoever owns the pack: what changed, why, and what is being done.

One week of the pack, four sites (invented figures and sites)
SiteSales per trading dayAgainst last yearLabour %Usual rangeFlag and action
LEE£3,0000%29%27 to 32None
MAN£2,400+4%33%27 to 32Outside range. Operations lead rings the manager about the rota by Wednesday
NOT£1,800Not comparable41%Not yet, under 13 weeksNew site, opened 3 November. Review at week 13
BHM£2,700-6%30%28 to 33None. Sales down but labour in range. Watch next week

Labour percentage and the usual range follow part 1's definitions and part 3's range rule. A new site gets no flag until it has a history, and says so on the page.

What does each column mean, and who explains a flag?

Each column has one definition, one source and one person who explains it when it is flagged. Write this once, beside the pack, so nobody reopens it on a Tuesday.

Column specification for the pack (the sources and owners are examples)
ColumnDefinitionSourceExplains a flag
Sales per trading daySales excluding VAT, divided by days the site tradedTill end-of-day reportsSite manager
Against last yearPer trading day, like day with like daySame, plus the holiday calendarPack owner
Labour %Pay, employer NI and agency over sales excluding VATPayroll and purchase ledgerSite manager
ActivityUtilisation or covers on the agreed definitionBooking system or tillsSite manager
Usual rangeLowest to highest of the last 13 weeks, holidays markedThe pack historyPack owner
Open exceptionsCount of items past their due dateThe site issue logOperations lead

The 13-week range is our suggestion, not a standard. Pay and agency figures arrive from payroll and the purchase ledger, which often lag the tills. Mark the labour column provisional on Monday where payroll is not yet final.

When should the week close and the pack go out?

Close the week on the same day every time, lock the data a fixed number of hours later, and publish before the meeting. Pick the week that fits your trade, then never move it.

There is a precedent. The British Retail Consortium's weekly retail sales scheme, now called the Retail Sales Benchmark (participants still submit by 4pm each Monday), is described in an undated scheme document that asks participants to submit a Sunday-to-Saturday week every Monday by 4pm, returns benchmarks by Tuesday lunchtime and compares each week with the same week last year. Your own week may run Monday to Sunday instead. What matters is that every site, the till reports and the pack agree on it.

A suggested weekly rhythm

  1. Sunday night

    Week closes

    Last trading day ends at the agreed cut-off.

  2. Monday 09:00

    Data locks

    Feeds arrive. Blank cells say why, as in part 2.

  3. Monday 12:00

    Pack published

    One page, three sentences, flags and owners filled in.

  4. Tuesday 09:30

    Review, 25 minutes

    Last week's actions first, then flagged rows only.

  5. Tuesday 10:00

    Actions logged

    Each with an owner and a date.

Two working days from close of trading to logged decisions, with the pack out before the meeting starts.

How do you compare with last year when bank holidays move?

Compare sales per trading day, and compare like days with like days. Then record each site's nation, because the holidays differ.

Bank holidays that moved between 2026 and 2027, England and Wales
Holiday20262027
Good Friday3 April26 March
Easter Monday6 April29 March
Early May4 May3 May
Spring25 May31 May
Summer31 August30 August

Source: GOV.UK bank holidays. Scotland has no Easter Monday holiday and its summer holiday is 3 August 2026 and 2 August 2027. Northern Ireland adds 17 March and a July holiday. A group with sites in more than one nation needs a holiday calendar per site.

GOV.UK's list of bank holidays shows the problem plainly: Easter Monday was on 6 April in 2026 and is on 29 March in 2027, so the same calendar week will hold different holidays in different years.

  • Illustrative site that closes on bank holidays. This week it traded 6 days and took £18,000. The same week last year it traded 7 days and took £21,000.
  • Raw change: 18,000 / 21,000 = 0.857, so a drop of 14.3%.
  • Per trading day: 18,000 / 6 = £3,000 this week and 21,000 / 7 = £3,000 last year. The change is 0%.

Where a bank holiday is a strong day for a site, such as a leisure venue, compare it with last year's bank holiday and not with an ordinary day. Mark the day on the page so a reader can see why a figure is not comparable.

How should the weekly review run?

Briefly, from the page, and only on the rows that are flagged. The NHS England guide to using data warns that narrating change between consecutive points leads to conversations about insignificant movement, which is what a round of every site's week-on-week change becomes.

  1. 1

    Last week's actions first (5 minutes)

    Each one closed, still open or dropped, with a reason. An action that is open for four weeks is raised with the owner of the pack.

  2. 2

    Flagged rows only (10 minutes)

    The site's owner says the cause and the next step, in a minute. Nothing is discussed that is not on the page.

  3. 3

    One unflagged site by rotation (5 minutes)

    Ask what is working there. Choose by turn, not by the best number, so every site gets a turn.

  4. 4

    Decisions logged (5 minutes)

    Owner and date for each, written before anyone leaves.

The three sentences on the page are written beforehand by whoever owns the pack. If they cannot say why a number moved, say so, and ask the site to find out. Keep the written pack for the record, as it is what makes next quarter's range calculation possible.

What should stay off the pack?

  • Staff names and per-person figures. Part 3 explains why that needs a deliberate decision.
  • Any number without a row on the choice sheet from part 1.
  • More than seven columns. Choosing them is covered in choosing five numbers, and the extras live one click down.
  • Forecasts from the pack's author with no source. A forecast belongs in a separate note.

If the pack is still assembled by hand each Monday, the cost sits in the chase more than the page. Management reporting without the spreadsheet chase covers moving to a live source, and part 2 covers joining tills, bookings and accounts.

What mistakes wear a weekly pack out?

  • Changing the columns every few weeks because someone wants something new. Add one at a time, and retire one for each.
  • Publishing late and re-sending. Lock the data at a fixed hour and mark anything that later changes.
  • Comparing a short week with a long one on raw totals.
  • Using the meeting to read the page aloud. Everyone has read it, so start with the actions.

Questions people ask

One row per site and the same six or seven columns every week: sales per trading day against last year, labour percentage, a measure of activity such as utilisation or covers, open exceptions and a flag. Add three sentences on what changed, why and what is being done. Keep staff names and extra metrics off the page.

Compare sales per trading day, not weekly totals, and compare like days with like days. Easter and other bank holidays fall in different weeks each year, and Scotland and Northern Ireland have different holidays from England and Wales. Divide each week's takings by the days the site traded, and mark any week where a holiday or closure applied.

At a fixed hour after the week closes, for example Monday morning for a week that ends on Sunday night. Publish before the review meeting and mark any figure that changes afterwards, with the date. A fixed lock time lets managers rely on the pack arriving, and stops late corrections turning into a second version.

Around 25 minutes works as a starting point, though that is our suggestion and not a researched figure. Open with last week's actions, discuss only flagged rows, look at one unflagged site by rotation, and log decisions with an owner and date. If the meeting overruns, the pack probably has too many columns.

Further reading

Have a problem this does not solve?

Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.

Book a call

Start here

Tell us what takes your team time.

Leave a few lines and we will reply by email.

Or email [email protected]

Company size

Used to reply to you. See our privacy notice.