Guide

Published 22 November 2026
Last reviewed 22 November 2026
7 min read
Part 2 of 4

One view across tills, bookings and accounts

Join tills, bookings and accounts on three things before anything else: a master list of sites, one rule for the trading day and a named source of record for each number. Then reconcile the view to the ledger weekly.

Three people stand round a laptop in a bright workshop hall with metal frames and equipment on trolleys.
Mixed systems can still give one view, if each one feeds the same definitions.

This is part 2 of 4 on running several sites, and it assumes you have agreed what each KPI means, which part 1 covers. Here is the plumbing: the site list, the clock, the bridge to the accounts, what to show when a feed fails, and when a build is justified. We stay with totals by site and day, not matching individual customers.

What do you decide before connecting anything?

Three things: which code identifies a site, when a trading day starts and ends, and which system is the source of record for each number. Without them every connection you build carries a guess.

Site master list: one row per site, with its name in every system (invented example)
Site codeTill locationBooking calendarLedger tagStatus
LEELeeds CentralLeeds BriggateLS1Trading
MANMCR 2ManchesterMancTrading
NOTNottingham (new)NottsNGOpened 3 November 2026

The first column is the only key. When a site opens, closes or is renamed in one system, you change one row and every report follows. Add opening and closing dates so like-for-like comparisons know which sites count.

Why does the trading day need a rule of its own?

Because the three systems date the same sale differently. A rule that says which date counts stops sales appearing on two days or none.

  • Tills usually date a sale by the clock or by the end-of-day report. A sale at 00:30 on a late Saturday may belong to Saturday's trading day or to Sunday's, depending on the setting.
  • Bookings have at least two dates: when the booking was made and when the appointment happens. Pick appointment date for activity, and the date of payment for cash.
  • Accounts date entries by invoice or posting date, which can be days after the trade.

Write the rule as one line per system, for example "trading day runs from 05:00 to 04:59, appointments count on the day they take place, ledger entries are matched by trading day, not posting date". If you use a VAT retail scheme, HMRC's manual describes daily gross takings as a record of supplies made that day, which makes the till's end-of-day total the natural source of record for sales.

How do you bridge the tills to the ledger?

List every known difference between the till total and the ledger figure for the same week, in order, until the gap is zero. The bridge is the proof that the view can be trusted.

Weekly bridge, three sites (illustrative figures, arithmetic shown)
StepAmountWhy
Till takings, all payment types£61,200Sum of the three end-of-day totals
Less card tips collected for staff- £1,200Tips are passed to workers, so they are not sales
Sales including VAT£60,00061,200 - 1,200
Less VAT at 20%- £10,00060,000 / 1.2 = 50,000, so VAT is 60,000 - 50,000
Sales excluding VAT£50,000The basis chosen in part 1
Less voucher sales held as a liability- £400Counted as sales on the till, income only when redeemed in the ledger
Less refund posted after the cut-off- £200Timing: ledger posted it on Monday
Expected ledger sales£49,40050,000 - 400 - 200
Ledger sales for the week£49,400Difference £0

Both adjustments are common causes of a gap, not rules. If the ledger and the bridge differ by an amount you cannot explain, stop and find it before you publish the week.

The tips line rests on the Employment (Allocation of Tips) Act 2023, which has required all tips to be passed to workers without deductions since 1 October 2024. How vouchers, tips and VAT should be treated is a question for your accountant, and this is not tax advice.

What should the view show when a feed is late or wrong?

A visible gap with a stamp, never a silent zero. Decide the behaviour for each failure now, because the first time it happens is a Monday morning.

Failure rules: decide these once
What happensWhat the view showsWho is told
A site's till export has not arrivedThe site's cell stays blank with "no data since" and the last good date. The group total is labelled "excludes MAN".Operations lead, same morning
A figure moves after publicationThe new figure replaces the old, with a note of the change and the date.Whoever received the pack
A new site appears in a system with no codeIt is held out of totals and listed as "unmapped".Owner of the master list
The bridge to the ledger does not closeThe week is marked provisional.Finance lead

Every number carries an "as at" time, so a reader knows whether they are looking at this morning's data or Friday's.

Do you need a build, or will the suppliers' own reports do?

Often the suppliers' own multi-site reports do. A build earns its place when numbers from several systems must be joined by rules of your own. For businesses that work by product, orders, stock and suppliers in one view is the same idea.

Four questions on the way to a build

  1. 1.Are all sites on the same till and booking supplier?

    Yes
    Start with that supplier's own multi-site reports and test each against your choice sheet from part 1
    No
    Go to question 2
  2. 2.Does the accounting package tag every transaction by site?

    Yes
    Go to question 3
    No
    Set up site tags in the ledger first, or nothing can be bridged
  3. 3.Can each system export totals by site and day on a schedule?

    Yes
    Go to question 4
    No
    Ask the supplier how, and treat that system as manual until it can
  4. 4.Is every join limited to site code, day and amount?

    Yes
    A reporting tool over scheduled exports will do
    No
    Customer-level or job-level joins are where a small build starts to earn its place

Most groups stop at the first or fourth answer: a supplier report, or a reporting tool over scheduled exports.

Check the ledger's limits before you rely on site tags. One accounting-software partner's guide says Xero allows two active tracking categories with up to 100 options each, so confirm the current limit for your plan, because a group with many sites and a second dimension can reach it. Connecting Outlook, Xero, HubSpot and your own system covers the connection options, and build, buy or configure gives the wider test.

In what order do you connect things?

  1. 1

    Write the site master list

    One row per site, with its name in every system and its opening and closing dates.

  2. 2

    Fix the trading day

    One line per system, agreed with the finance lead.

  3. 3

    Name the source of record for each number

    Use the choice sheet from part 1. Daily sales from the till, appointments from the booking system, revenue and cost from the ledger.

  4. 4

    Bring in one number first

    Daily sales by site, from every till into one table with the site code and an "as at" time. Check three days by hand against the tills.

  5. 5

    Run the bridge each week

    Keep going until two weeks close with no unexplained difference.

  6. 6

    Add the next number

    Booked and attended appointments, then labour, then cost lines. One at a time, each with its own bridge or check.

A site's customers are a separate decision. Matching people across systems makes personal data decisions of its own, which one customer record starts to cover, and nothing in this article needs it.

What mistakes make the view untrustworthy?

  • Joining on site names. One rename in one system silently drops a site.
  • Letting the view fix numbers. If it adjusts a figure to match the ledger, the problem has been hidden instead of found.
  • Starting with ten numbers. One reconciled number is worth more than ten that nobody checked.
  • Skipping the as-at time. Readers cannot tell fresh from stale.

Questions people ask

Agree a master list of sites with one code, one rule for the trading day, and a source of record for each number. Then bring in one number at a time, such as daily sales by site, and check it against the ledger each week. Reporting tools over scheduled exports cover most groups before a build is needed.

Usually for a few ordinary reasons: VAT, tips collected for staff, vouchers sold but not yet redeemed, refunds posted on a different day, and card settlement timing. List each as a line in a weekly bridge until the difference is zero. If a gap stays unexplained after that, investigate it before publishing the week.

Yes, when every site uses the same supplier and the report's definitions match your choice sheet. Test it by recomputing one site's week by hand. It will not join bookings or accounts, so a group on mixed systems usually needs a reporting tool or a build for the cross-system numbers.

Show a visible gap with the last good date and label any group total as excluding that site. A zero would suggest the site traded nothing, and a silent estimate hides a fault. Tell a named person the same morning and mark any figure that later changes with the date of the change.

Further reading

Have a problem this does not solve?

Book a discovery call. Tell us what is slowing the business down, and we will say what we would build and whether it is worth doing.

Book a call

Start here

Tell us what takes your team time.

Leave a few lines and we will reply by email.

Or email [email protected]

Company size

Used to reply to you. See our privacy notice.